A Secret Weapon For Micro pile construction methods
Elevate the bottom horizontal structural member of the floor assembly to become at least twelve inches higher than the Base Flood Elevation.If the exam piles get to or surpass the engineer's criteria for design loads, they must be satisfactory for creation piles. Should they hold a lower load, they will nevertheless be used.The geotechnical engin